Material Management: A Sustainable Way to Reduce the Wastage
DOI:
https://doi.org/10.53555/nnbma.v1i1.144Keywords:
material management, waste management, moneyAbstract
In today’s world construction work are going at unexpected speed in all area like building, bridge, high-rise and so on. As we know there are two side of coin same way there are some disadvantage of this speedy construction which leads towards a wastage, like Material, Money, Time, and so on. One of the most important part of wastage is due to Improper Material Management. If we not prepare good management technic of material management than it convert in to wastage. It shall be very hard to manage wastage rather than managing the material. So if we want to manage the waste we need to manage the material in Proper Way. For that first of all we need to find out the importance of Phases of Material Management and Crucial Factors which affects the material management.
References
Abdul-Rahman,. H. and Alidrisyi, M. N. (1994) “A Perspective of Material Management Practices in a Fast Developing Economy; the case of Malaysia”. Construction Management and Economics, 12, 412-422.
Aibinu A.A and Jagboro G.O (2002): “The Effects of Construction Delays on Projects Delivery in Nigeria Construction Industry”. International Journal of Project Management, 20, 593-599.
Al-Jibouri, S. (2002): “Effects of Resource Management Techniques on Projects Schedules”. International
Assaf, S.A., Al-Khalil, M. and Al-Hazmi M. (1995): “Causes of Delay in Large Building Construction Projects”. Journal of Management in Engineering March/April.
Choudhury, I. and Phatak, O. (2004): “Correlates of time Overrun in Commercial Construction”. ASC Proceedings of the 40th Annual Conference. Brigham Young University, Provo, Utah, April 8-10.
Hafez, N (2001): “Residential Projects Obstacles and problems in Kuwait MS Project”, Department of Civil Engineering, Kuwait University.
Henesy, M. (1993): “Tools of Total Quality Management”. Journal of Construction Engineering and Management ASCE. Pg 9(4), 329-339
Illingworth, J. and Thain, K. (1998): “Material Management is it Worth It?” Technical Information Service, The Chartered Institute of Building ASCOT. 93, 1-5
Kaming, P.F, Olomolaiye, P. O., Holt, G.O. and Harris F.C. (1997): “Factors Influencing Construction Time and Cost Overruns on High-Rise Project in Indonesia”. Construction Management and Economics, 15, 83-94
Koushki, P.A and Kartan, N. (2004): “Impact of Construction Materials on Project Time and Cost in Kuwait, 11 (2), 123-132.
Kraiem, Z.M and Dickman, J.E (1987): “Concurrent Delays in Construction Projects”. Journal of Construction Engineering and Management, 113 (4), 691 –602
Kwik.K.G. (1994): “Cement and Its Problem in Indonesia”. Kompas October. 10
Manavazhi, M.R and Adhikari, D.K (2002): “Material and Equipment Procurement Delays in Highway Projects in Nepal”. International Journal of Project Management, Pg 20, 627-632
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Terms & Condition
Submission -
Author can submit the manuscript through our online submission process or email us at the designated email id in contact details.
The other mode of submission not accepted than online and email.
Before submission please read the submission guidelines.
NN Publication accepts only article submitted in pdf/doc/docx/rtf file format. Another format except given file formats will no be considered .
Author will be responsible for the error mistakes in the submission files. The minor changes can be done without any cost after publication. But for major changes NN Publication may charges you the editing charges.
Publication (Online) -
The online publication is scheduled on last date of every month, but it can be delayed by 24 to 48 hours due to editorial process if huge number of articles comes to publish in single issue.
Automatic notification email will be sent to the all users on publication of an issue, so its author’s duty to check their email inbox or SPAM folder to get this notification.
After publication of article author can not withdraw their article.
If editor’s found any issue after publication of article then the NN Publication have the authority to remove the article from online website.
No refund will be provided after online publication of article.
Publication (Print) -
The print copy publication are sent as per the author’s request after 2 weeks of online publication of that issue.
NN Publication will ship the article by India Post and provide the consignment number on dispatch of print copy.
NN Publication follows all the guidelines of delivery provided by India Post and hence not responsible for delay in delivery due to any kind of reasons.
Refund of hard copy will not be provided after dispatch or print of the journal.
NN Publication will be responsible for raise a complain if there is any issue occurs in delivery, but still will not be responsible for providing the refund.
NN Publication will be responsible to resend the print copy only and only if the print copy is lost or print copy is damaged in delivery / or there is delay more than 6 months.
According to India Post the delivery should be completed with in 1-3 weeks after dispatch of articles.
Privacy Policy-
NN Publication uses the email ids of authors and editors and readers for sending editorial or publication notification only, we do not reveal or sell the email ids to any other website or company.